|
Integrated production and material handling scheduling using mathematical programming and constraint programming [An article from: European Journal of Operational Research] | ![Integrated production and material handling scheduling using mathematical programming and constraint programming [An article from: European Journal of Operational Research]](http://ecx.images-amazon.com/images/I/51G4P0G7AGL._SL160_.jpg) | Authors: G.E. Khayat, A. Langevin, D. Riopel Publisher: Elsevier Category: Book
Format: HTML Media: Digital
ASIN: B000PAUKLY
Publication Date: December 16, 2006
| | |
| Editorial Reviews:
Product Description This digital document is a journal article from European Journal of Operational Research, published by Elsevier in 2006. The article is delivered in HTML format and is available in your Amazon.com Media Library immediately after purchase. You can view it with any web browser.
Description: In this article, we propose an integrated formulation of the combined production and material handling scheduling problems. Traditionally, scheduling problems consider the production machines as the only constraining resource. This is however no longer true as material handling vehicles are becoming more and more valuable resources requiring important investments. Their operations should be optimized and above all synchronized with machine operations. In the problem addressed in this paper, a job shop context is considered. Machines and vehicles are both considered as constraining resources. The integrated scheduling problem is formulated as a mathematical programming model and as a constraint programming model which are compared for optimally solving a series of test problems. A commercial software (ILOG OPLStudio) was used for modeling and testing both models.
|
|
|
CERTAIN CONTENT THAT APPEARS ON THIS SITE COMES FROM AMAZON SERVICES LLC. THIS CONTENT IS PROVIDED ‘AS IS’ AND IS SUBJECT TO CHANGE OR REMOVAL AT ANY TIME. | |